web: disable Mantine transitions in tests to kill post-teardown timer flake (#1760) (#1761)
Some checks failed
Run install, format, lint, build, and test on every push / build (push) Has been cancelled
Run install, format, lint, build, and test on every push / publish (push) Has been cancelled
Run install, format, lint, build, and test on every push / publish-github-container-registry (push) Has been cancelled

* web: disable Mantine transitions in tests to kill post-teardown timer flake (#1760)

A Mantine `Transition`/`Modal` open/close `setTimeout` can fire after happy-dom
tears down `window` at the end of a run, throwing an uncaught
`ReferenceError: window is not defined` that fails the whole `coverage` job even
when every assertion passed (seen on PR #1759's CI, originating in
ServerRemoveConfirmModal.test.tsx).

Set `env="test"` on the shared `renderWithMantine` MantineProvider so Mantine
renders transitions synchronously (no timer). This removes the leak class for
every test that renders through the shared wrapper (Modals, Menus, Popovers, …).
Also apply it to ViewHeader's local forced-dark provider.

The handful of tests that assert mid-flight transition state (ViewHeader's
`data-anim="out"` crossfade checks, #1450) genuinely need real transitions, so
add an opt-in `renderWithMantineTransitions` wrapper (env="default") and route
those three tests through it — each already drives the transition to completion
(waitFor/findBy) so it doesn't reintroduce the leak. Tests that assert only the
entered state stay on the default (leak-free) wrapper.

Full `npm run ci` green; unit run reports zero unhandled errors.

Closes #1760

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01XNdjEPKLG637X8YmhDiEk5

* docs: note the renderWithMantine env=test invariant in AGENTS.md (#1760)

Per review feedback: document that tests must render through
`renderWithMantine` (env="test", transition-free) rather than a hand-rolled
`MantineProvider`, and reserve `renderWithMantineTransitions` for asserting
mid-flight animation state (driving the transition to completion). Keeps future
tests from quietly reintroducing the post-teardown timer leak class.

Refs #1760

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01XNdjEPKLG637X8YmhDiEk5

---------

Co-authored-by: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
This commit is contained in:
Cliff Hall 2026-07-24 10:58:23 -04:00 • committed by GitHub
commit 2439ef9c3c
No known key found for this signature in database
GPG key ID: B5690EEEBB952194

View file

@ -200,7 +200,7 @@ gh project item-edit --project-id PVT_kwDOCt2Azc4BJVxt --id "$ITEM_ID" --field-i
- **TUI** (`clients/tui`): the gate covers the **non-React logic** only — `logger.ts`, `components/tabsConfig.ts`, and `utils/*` (server resolution lives in `core/` and is measured by the web suite). The Ink components, `App.tsx`, and `hooks/` are an **interim exclusion** in `clients/tui/vitest.config.ts` pending the renderer-based follow-up (#1501). When adding new **non-React** logic under `clients/tui/src`, it falls under the gate automatically — add tests for it.
- Run `npm run test:integration` (also from `clients/web/`) for the InspectorClient + transport + auth integration suite. It runs under a separate `integration` vitest project in node env (no happy-dom) with 30s timeouts. The script builds `test-servers/` first via `tsc -p ../../test-servers --noCheck` so the stdio MCP test server can be spawned as a real subprocess. CI does not run `test:integration` as its own step — the integration project is covered by the CI `coverage` gate, whose web `test:coverage` runs `--project=unit --project=integration --coverage`.
- Test files live alongside the source as `<Name>.test.tsx` (or `.test.ts` for non-React modules). Integration tests live under `clients/web/src/test/integration/`, mirroring the `core/` source layout (`mcp/`, `mcp/node/`, `mcp/remote/`, `auth/`, `auth/node/`, `storage/`). Any test file under that folder is automatically picked up by the `integration` vitest project (node env, 30s timeouts) via the folder glob in `vite.config.ts` — placement is the manifest, there is no enumeration to keep in sync. Tests outside the folder run in the `unit` project (happy-dom). When adding a new test for, e.g., `core/mcp/remote/foo.ts`, put it at `src/test/integration/mcp/remote/foo.test.ts`.
- Use `renderWithMantine` from `src/test/renderWithMantine.tsx` to render components — it wraps in `MantineProvider` with the project theme
- Use `renderWithMantine` from `src/test/renderWithMantine.tsx` to render components — it wraps in `MantineProvider` with the project theme. It sets `env="test"` so Mantine renders transitions synchronously (no internal `setTimeout`); this prevents a `Transition`/`Modal` timer from firing after happy-dom tears down `window` at end-of-run and failing the whole run with an uncaught `ReferenceError: window is not defined` (#1760). **Always render through `renderWithMantine`; do not hand-roll a bare `MantineProvider` in a test** (that reintroduces the leak class). Only when a test must assert *mid-flight* transition state (e.g. a `data-anim="out"` cell during an exit crossfade) use `renderWithMantineTransitions` (real transitions) — and that test MUST drive the transition to completion (`await waitFor`/`findBy`) so its timer resolves before teardown.
### Responding to Code Reviews
- When asked to respond to a code review of a PR,