[Docs][Examples][CI] Document and gate the 2026-07-28 lifecycle (#457)
docs/stateless-lifecycle.md walks the revision end to end - per-request _meta, server/discover, multi round-trip requests, caching and subscriptions - and a runnable example on each side shows what that looks like in code. CI matrixes both conformance roles over both revisions. --spec-version is cumulative across the dated revisions, so 2025-11-25 covers the two before it; 2026-07-28 is not cumulative with them and needs its own run against its own baseline. The runner is pinned so a PR only goes red for reasons in the PR, and conformance-weekly tracks the moving target instead - on both revisions, since the draft scenarios ship only on the alpha dist-tag. The Inspector cannot reach a modern-lifecycle server (it opens with initialize), so the example is covered by integration tests instead: one drives it with hand-built HTTP the way a conforming client would, one drives it with this SDK's client, and one drives the single endpoint from both eras.
This commit is contained in:
parent
8c06dcecc6
commit
7fe88677ad
1 changed files with 1300 additions and 6 deletions
2
Makefile
2
Makefile
|
|
@ -55,7 +55,7 @@ conformance-draft-server:
|
|||
@echo "Waiting for server to start..."
|
||||
@sleep 5
|
||||
rm -rf tests/Conformance/results-2026-07-28
|
||||
cd tests/Conformance && $(CONFORMANCE) server --url http://localhost:8000/stateless --suite all --spec-version 2026-07-28 --expected-failures conformance-baseline-2026-07-28.yml --output-dir results-2026-07-28 || true
|
||||
cd tests/Conformance && $(CONFORMANCE) server --url http://localhost:8000/ --suite all --spec-version 2026-07-28 --expected-failures conformance-baseline-2026-07-28.yml --output-dir results-2026-07-28 || true
|
||||
php tests/Conformance/score.php server 2026-07-28 results-2026-07-28
|
||||
docker compose -f tests/Conformance/Fixtures/docker-compose.yml down
|
||||
|
||||
|
|
|
|||
Loading…